President’s Cabinet Meeting
Tuesday, July 13, 2010
9:00 a.m.
 
 
 
MINUTES
 
ATTENDEES:  President Ivory V. Nelson, Vice President Howard E. Merlin, Executive Vice President Michael B. Hill, Provost and Senior Vice President Grant D. Venerable II,  and Ms. Diane M. Brown.  Mr. John Thompson, Director of Physical Plant, and Dr. Harold Aubrey, Assistant Vice President and Director of Assessment attended a portion of the meeting.
 
MINUTES
 
The July 7, 2010 Cabinet minutes were approved.
 
 
PRESIDENT’S DISCUSSION AGENDA
 
Lincoln University 2010-2011 Operating Budget Preparations – Version 8 of the proposed budget distributed by Vice President Merlin was reviewed in detail.
 
The University’s healthcare plan premiums were also discussed.  Dr. Debbie Bullock joined the discussion via teleconference to discuss this matter.
 
Lincoln University Board of Trustees – Mr. Gregory Paul Montanaro is a new Senate appointee  to the Lincoln University Board of Trustees.
 
MSCHE – Drs. Venerable and Aubrey provided an update on the plans and preparations being made in anticipation of the small team visit schedule for September 24, 2010.
 
 
PHYSICAL PLANT BRIEFING
 
Mr. Thompson gave the following report:
 
The summer work is proceeding well and on schedule.
 
1.      Amos House Soffit Repairs                                                    $7,000 contracted
2.      Amos House Heating Upgrades                                            $22,000 in design
3.      Ashmun Hall Lobby Upgrades                                               $35,000 working
4.      Fredrick Douglas Hall Lounge Upgrades                              $30,000 working
5.      Fredrick Douglas Hall, Pumps & Valves                                $20,000 working
6.      Fredrick Douglas Hall Hot Water Upgrades                         $28,000 in design
7.      Hansberry Hall Hot Water System                                        $15,000 in design
8.      Hansberry Hall Ventilation Upgrades                                   $45,000 in design
9.      Hansberry Hall Hot Water Plate Heater                               $30,000 re-design
10.  Hansberry Hall Sinks and Vanities                                         $10,000 in design
11.  Lucy Laney Hall Bathroom Exhaust System                           $15,000 in work
12.  McCauley Hall Bathroom Upgrades                                      $40,000 working
13.  McCauley Hall Hot Water Conversion                                  $82,000*
14.  McRary Hall Hot Water Conversion                                     $35,000 *NG permit is due
15.  McRary Hall New Lobby Lights                                              $6,000 working
16.  McRary Hall Electrical Upgrades                                         $80,000*  working
17.  McRary Hall Bathroom Upgrades                                        $95,000* working
18.  Rendall Hall Basement Repairs                                           $30,000
19.  Rendall Hall Hot Water Plate Heater                                   $30,000
20.  LLC Wiring of the Smoke Alarms                                          $67,500 in work
21.  LLC Replace Room Lights                                                     $48,000 in work
22.  All Residence Buildings, Furniture                                     $100,000
                                         Key Boxes                                             $2,000 in work
                                         Door Alarms                                      $17,500 in work
                                         Hall Light Controls                              $9,000
                                         Clean Fin Tubes                                   $6,000
 
Grand Total 2010 Summer                                                        $905,000
Estimated completion spring 2011                                             292,000
 Total for 2010 Summer                                                            $613,000
 
(*) indicates the estimated completion date of spring 2011
 
        Project 1101-28 Increase Generation: Chris Morris, our Project Manager has set up a meeting this week with DGS, a consultant, the professional to develop our path forward now that we have full load readings and we know our demands.
        Project 1101-32 Vail Hall: We have started abatement on the glazing where the window A/C units will be removed. Work is proceeding.
        Projects 1101-39 (Grimm) 1101-43 (Wright) and 1101-44 (Library):  The safety fence is scheduled to be installed this week. The contractors will mobilize over the next 2 weeks.
        Project 1101-47: The contractors are beginning to work on the lay-out and building location. Because this project is starting before the Landscape project, some erosion control steps must be taken ahead of time to meet the erosion control requirements.
        Projects 1101-45 (Landscape) and 1101-46 (Athletics): The award letters have been sent to the apparent winners and DGS is awaiting their approvals.

        
Currently, we plan on having the following assignments:
1.      1101-28-3 Additional Generator = J. Thompson & Chris Morris
2.      1101-32 = J. Thompson
3.      1101-38 (roof repairs) = Joe Urban
4.      1101-39, 43, 44, = Gerry Davis & Joe Urban
5.      1101-45, 46 = Chris Morris & Horticultural Manager (funded position)
6.      1101-47 = Jim Teal

        
Swing space Modular’s for the Vail and the Lincoln Hall project are planned to be set.  We are adding a unit to the 7 plex (formally known as the 6 plex) which will change the design and require a new permit. I’m working with the Township to make this happen quickly.
        The Library Collection move is complete. A special thanks to everyone who made this possible.
 
John Thompson
Director Physical Plant.
 
Notices of the work projects undertaken in the residence halls over the summer months will be posted in the residence halls for the information of the student body.
 
 
ENROLLMENT MANAGEMENT
   
Fall 2010 Admission Statistics (As of 07.11.10) -
 
Undergraduate Admissions:
                                        Fall 2009             Fall 2010             Fall 2010
                                                                                                (900+ SAT)
Applications Received       7713                    6907                     749
Admitted                           2356                    1541                     597
Deposits Paid                      623                      279                      99
 
 
Graduate Admissions:
                                        Fall 2009             Fall 2010   
                                                                                     
Applications Received        379                      343         
Admitted                            212                      189         
   
ADJOURNMENT
 
There being no further business, President Nelson adjourned the meeting at 12:30 p.m.

Return to President's Information Exchange.